Hydrotherapy Pool Refurbishment
This refurbishment a Hydrotherapy Pool near Royston in Hertfordshire, included recovering the floor with anti-slip tiles, retiling the pool in mosaic tiles, re-sloping the floor, changing the floor levels, constructing new walk-in steps, fitting a new automatic wall-mounted pool cover, dismantling the gully, cleaning and refitting the plastic grate onto the original frame, new sanitation system, new fittings and new pipes. In addition a new dehumidifier, Alto Aquarius safety flooring in wet room, Aqua boarding on shower walls, new stud work with vapour barrier, new drain gully in shower and one in wet room and hand pump transfer for chlorine.
A service and maintenance contract was put in place on completion and we continue to work with this client on a reular basis.
Browse the gallery below to see this project take shape.